Grandweld Shipyards has delivered Surfer 341, the first of two new 34-metre high-speed crewboats built for offshore services provider BOURBON, handing over the vessel at its Dubai Maritime City yard on 3 November 2026 following successful sea trials. The sister vessel, Surfer 342, is scheduled for delivery by early December 2026. Surfer 341 can reach a maximum service speed of more than 40 knots and carries up to 60 offshore personnel in business-class-style seating. Its passenger module is structurally independent and resiliently mounted to isolate occupants from noise and vibration. The vessel is built to the High-Speed Craft 2000 Code and features four main engines driving four maneuverable waterjets for operational redundancy, an Electronic Fuel Monitoring System, a cyber-secure Alarm and Monitoring System, CCTV with intruder alert, and satellite communications linking to BOURBON's onshore teams. Designed for intensive crew-transfer operations off West Africa, the vessel features a full-flush manoeuvring bridge with ECDIS and two radars, aircraft-style overhead lockers, dedicated foredeck luggage containers, a passenger rest area, a lounge with pantry, a sick bay, three crew cabins and a workshop. Jamal Al Abki, General Manager of Grandweld Shipyards, said vessel availability is central to crew-transfer value and that Surfer 341 was engineered accordingly. The order extends a partnership between Grandweld and BOURBON dating back to 2006, which has previously included fast supply intervention vessels, 100-tonne bollard-pull escort tugs and hybrid seismic support vessels.